Co-developer, equity participant, turnkey design and build contractor, consortium partner or constructor for power plants.
 |
|
| › |
Bulk earthworks |
| › |
Heavy concrete works |
| › |
Plant infrastructure |
| › |
Rail and road infrastructure |
| › |
Pipelines |
|
|
| |
 |
|
| › |
Construction of silos, stacks and
chimneys using sliding technology |
| › |
Construction of loaded sections and
decks using pre- and post-tension
techniques and large precast
components |
|
|
| |
 |
|
| › |
Heavy lifting and mechanical
construction |
| › |
Structural steel fabrication
and erection |
| › |
Materials handling |
| › |
Piping and ducting |
| › |
Heavy electrical |
| › |
Instrumentation and control systems |
|
|
| |
 |
|
| › |
Water systems and treatment |
|
|
| |
 |
|
| › |
Sub-stations |
| › |
Black start generation systems |
|
|
| |
 |
|
| › |
Construction materials |
| › |
Manufactured building components |
| › |
Fabricated steel, rebar and mesh |
| › |
Steel and fibre cement piping |
|
|
| |
 |
|
| › |
Construction camps and temporary
accommodation |
| › |
Housing and buildings |
|
|
| ‘10 |
|
‘09 |
|
‘08 |
|
‘07 |
|
‘06 |
| Sasol OCGT contract |
|
Orapa Botswana IPP |
|
Aba power station |
|
Ibom gas-fired
power station |
|
Perinni Corporation |
| South Africa |
|
Botswana |
|
Nigeria |
|
Nigeria |
|
UAE |
| Engineer, procure, construct
and commission, including
performance testing the
open cycle gas turbines as
part of the Combined Cycle
Power Generation Project
at Secunda. |
|
Engineering and design
work, including conceptual
works, as well as the
procurement of two GE
LM6 000 gas turbines. |
|
Design, supply and
installation of three gas
turbines, with a combined
output of 120 megawatt for
the Aba power station. |
|
A multi-disciplinary contract
for the design, supply and
construction of a gas-fired
power plant. |
|
Civils and infrastructure
works for a 40 megawatt
open cycle gas turbine. |
|